Cost Breakdown
Name/Model: Gossamer TU (Fiend "Pit") F1-3ND-P
Technology: Inner Sphere
Tonnage: 25
Configuration: VTOL Combat Vehicle
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (69 pts) 3.5 x 25,000 87,500.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 112,500.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 127,500.00
Rotors 2.5 x 40,000 (+) 100,000.00 = 227,500.00
Engine (Fusion) (5,000 x 110 x 25) / 75 (+) 183,333.33 = 410,833.33
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 410,833.33
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
Light PPC 150,000 150,000.00
PPC Capacitor 150,000 (+) 150,000.00 = 300,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 500,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 500,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 510,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 520,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 530,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 530,000.00
==============================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost 410,833.33
Weapons and Equipment Cost (+) 530,000.00 = 940,833.33
Combat Vehicle Cost Multiplier 1 + (25 / 30) (*) 1.833 = 1,724,547.50
------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,724,547.00
|