Cost Breakdown
Name/Model: Saladin Saladin-1VGL
Technology: Inner Sphere
Tonnage: 35
Configuration: Hover Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (49 pts) 2.5 x 25,000 62,500.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 97,500.00
Control Components 2 x 10,000 (+) 20,000.00 = 117,500.00
Lift/Dive Equipment 3.5 x 20,000 (+) 70,000.00 = 187,500.00
Engine (Fuel Cell) (3,500 x 105 x 35) / 75 (+) 171,500.00 = 359,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 361,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 361,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 650,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 650,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 650,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 361,000.00
Weapons and Equipment Cost (+) 650,000.00 = 1,011,000.00
Combat Vehicle Cost Multiplier 1 + (35 / 50) (*) 1.7 = 1,718,700.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,718,700.00
|