Cost Breakdown
Name/Model: gardian
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Standard) (172 pts) 11.0 x 10,000 110,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 160,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 185,000.00
Engine (Fusion) (5,000 x 200 x 50) / 75 (+) 666,666.67 = 851,666.67
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 851,666.67
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
Guardian ECM Suite 200,000 200,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 400,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 600,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 800,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,000,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,000,000.00
==============================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost 851,666.67
Weapons and Equipment Cost (+) 1,000,000.00 = 1,851,666.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,777,500.00
------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,777,500.00
|