Cost Breakdown
Name/Model: Pollux ADA Heavy Tank
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (107 pts) 6.0 x 20,000 120,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 195,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 235,000.00
Engine (Fusion) (5,000 x 225 x 75) / 75 (+) 1,125,000.00 = 1,360,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 1,377,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,377,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
Medium Laser 40,000 (+) 40,000.00 = 440,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 456,000.00
Sniper 300,000 (+) 300,000.00 = 756,000.00
Sniper (Ammo 10) [Empty Bin] 0 (+) 0.00 = 756,000.00
Sniper (Ammo 10) [Empty Bin] 0 (+) 0.00 = 756,000.00
Sniper (Ammo 10) [Empty Bin] 0 (+) 0.00 = 756,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 756,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,377,500.00
Weapons and Equipment Cost (+) 756,000.00 = 2,133,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 3,733,625.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,733,625.00
|