Cost Breakdown
Name/Model: Pezhetairos Heavy Tank
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
===========================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 382,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 417,500.00
Engine (Fuel Cell) (3,500 x 280 x 70) / 75 (+) 914,666.67 = 1,332,166.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,334,166.67
Turret 1 x 5,000 (+) 5,000.00 = 1,339,166.67
-----------------------------------------------------------------------------------------------------------
Total Structural Cost 1,339,166.67
===========================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Enhanced LRM 10 125,000 (+) 125,000.00 = 175,000.00
Enhanced LRM 10 125,000 (+) 125,000.00 = 300,000.00
Enhanced LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 300,000.00
Enhanced LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 300,000.00
Enhanced LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 300,000.00
Ultra AC/5 200,000 (+) 200,000.00 = 500,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
-----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
===========================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------
Structural Cost 1,339,166.67
Weapons and Equipment Cost (+) 500,000.00 = 1,839,166.67
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 3,126,583.33
-----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,126,583.00
|