Cost Breakdown
Name/Model: Zhukov X2
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 362,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 402,500.00
Engine (Fuel Cell) (3,500 x 300 x 75) / 75 (+) 1,050,000.00 = 1,452,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,454,500.00
Turret 2.5 x 5,000 (+) 12,500.00 = 1,467,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,467,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 850,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,467,000.00
Weapons and Equipment Cost (+) 850,000.00 = 2,317,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 4,054,750.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,054,750.00
|