Cost Breakdown
Name/Model: Long Bow Artillery Truck
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (96 pts) 5.5 x 20,000 110,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 160,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 185,000.00
Engine (XL) (20,000 x 300 x 50) / 75 (+) 4,000,000.00 = 4,185,000.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,185,000.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Arrow IV System 450,000 (+) 450,000.00 = 550,000.00
Arrow IV System (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
Arrow IV System (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 550,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 550,000.00
CASE 50,000 (+) 50,000.00 = 600,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 800,000.00
Medium Laser 40,000 (+) 40,000.00 = 840,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 840,000.00
========================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost 4,185,000.00
Weapons and Equipment Cost (+) 840,000.00 = 5,025,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 7,537,500.00
------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,537,500.00
|