Cost Breakdown
Name/Model: NAGINATA NGA-01
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (304 pts) 17.0 x 20,000 340,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 440,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 490,000.00
Engine (Fusion) (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,490,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,505,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,505,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 750,000.00
Medium Laser 40,000 (+) 40,000.00 = 790,000.00
Small Laser 11,250 (+) 11,250.00 = 801,250.00
Ultra AC/20 480,000 (+) 480,000.00 = 1,281,250.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,281,250.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,281,250.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,281,250.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 2,505,000.00
Weapons and Equipment Cost (+) 1,281,250.00 = 3,786,250.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 7,572,500.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,572,500.00
|