Cost Breakdown
Name/Model: ARMADILLO ADO-1
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (304 pts) 19.0 x 10,000 190,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 290,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 340,000.00
Engine (Fusion) (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,340,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,340,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Beagle Active Probe 200,000 (+) 200,000.00 = 300,000.00
Cargo, Standard (2 ton) 4 x 0 (+) 0.00 = 300,000.00
CASE 50,000 (+) 50,000.00 = 350,000.00
Compartment, Infantry (2 ton) 4 x 0 (+) 0.00 = 350,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 950,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 950,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 950,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 950,000.00
Machine Gun 5,000 (+) 5,000.00 = 955,000.00
Machine Gun 5,000 (+) 5,000.00 = 960,000.00
Machine Gun 5,000 (+) 5,000.00 = 965,000.00
Machine Gun 5,000 (+) 5,000.00 = 970,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 970,000.00
Paramedic Equipment 7,500 (+) 7,500.00 = 977,500.00
Paramedic Equipment 7,500 (+) 7,500.00 = 985,000.00
PPC 200,000 (+) 200,000.00 = 1,185,000.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 1,187,000.00
TAG 50,000 (+) 50,000.00 = 1,237,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,237,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 2,340,000.00
Weapons and Equipment Cost (+) 1,237,000.00 = 3,577,000.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 7,154,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,154,000.00
|