Cost Breakdown
Name/Model: Thor Artillery Vehicle SLDFu
Technology: Inner Sphere
Tonnage: 55
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (125 pts) 7.0 x 20,000 140,000.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 195,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 225,000.00
Engine (XL) (20,000 x 255 x 55) / 75 (+) 3,740,000.00 = 3,965,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 3,969,000.00
Turret 1 x 5,000 (+) 5,000.00 = 3,974,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,974,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
ER Large Laser 200,000 (+) 200,000.00 = 350,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 365,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 365,000.00
Thumper 187,500 (+) 187,500.00 = 552,500.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 552,500.00
Thumper (Ammo 20) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 552,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 552,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 3,974,000.00
Weapons and Equipment Cost (+) 552,500.00 = 4,526,500.00
Combat Vehicle Cost Multiplier 1 + (55 / 200) (*) 1.275 = 5,771,287.50
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,771,288.00
|