Cost Breakdown
Name/Model: Von Luckner Heavy Tank SLDFu2
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 305,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 345,000.00
Engine (XL) (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,845,000.00
Turret 3 x 5,000 (+) 15,000.00 = 4,860,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,860,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
LRM 10 (Ammo 12) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 850,000.00
LRM 10 w/ Artemis IV FCS 100,000 + 100,000 (+) 200,000.00 = 1,050,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 1,066,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,081,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,096,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,111,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,126,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,126,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,126,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,860,000.00
Weapons and Equipment Cost (+) 1,126,000.00 = 5,986,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 10,475,500.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 10,475,500.00
|