Cost Breakdown
Name/Model: Heavy ER PPC Carrier SLDFr
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (250 pts) 14.0 x 20,000 280,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 380,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 430,000.00
Engine (XL) (20,000 x 200 x 100) / 75 (+) 5,333,333.33 = 5,763,333.33
Heat Sinks (Single) 35 x 2,000 (+) 70,000.00 = 5,833,333.33
Turret 2.5 x 5,000 (+) 12,500.00 = 5,845,833.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,845,833.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
ER PPC 300,000 (+) 300,000.00 = 450,000.00
ER PPC 300,000 (+) 300,000.00 = 750,000.00
ER PPC 300,000 (+) 300,000.00 = 1,050,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,250,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,255,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,255,000.00
Trailer Hitch 0 (+) 0.00 = 1,255,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,255,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 5,845,833.33
Weapons and Equipment Cost (+) 1,255,000.00 = 7,100,833.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 14,201,666.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,201,667.00
|