Cost Breakdown
Name/Model: Shaman Epic Land Raider
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (272 pts) 17.0 x 10,000 170,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 250,000.00
Control Components 0 x 10,000 (+) 0.00 = 250,000.00
Engine (Internal Combustion) (1,250 x 160 x 80) / 75 (+) 213,333.33 = 463,333.33
Turret 2.5 x 5,000 (+) 12,500.00 = 475,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 475,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
Compartment, Infantry (3.5 ton) 7 x 0 (+) 0.00 = 200,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 600,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,000,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,005,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,010,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,015,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,020,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,025,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,030,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 1,030,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,030,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 475,833.33
Weapons and Equipment Cost (+) 1,030,000.00 = 1,505,833.33
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 2,710,500.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,710,500.00
|