Cost Breakdown
Name/Model: Condor Heavy Hover Tank SLDFr
Technology: Inner Sphere
Tonnage: 50
Configuration: Hover Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 8.0 x 20,000 160,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 210,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 235,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 335,000.00
Engine (XL) (20,000 x 215 x 50) / 75 (+) 2,866,666.67 = 3,201,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 3,209,166.67
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,209,166.67
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 550,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 550,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 610,000.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 612,000.00
Small Laser 11,250 (+) 11,250.00 = 623,250.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 623,250.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,209,166.67
Weapons and Equipment Cost (+) 623,250.00 = 3,832,416.67
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 7,664,833.33
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,664,833.00
|