Cost Breakdown
Name/Model: Yeti Coolant Vehicle SLDF
Technology: Inner Sphere
Tonnage: 70
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (152 pts) 9.5 x 10,000 95,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 165,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 200,000.00
Engine (Fusion) (5,000 x 190 x 70) / 75 (+) 886,666.67 = 1,086,666.67
Turret 0.5 x 5,000 (+) 2,500.00 = 1,089,166.67
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,089,166.67
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Cargo, Liquid (12 ton) 24 x 50 (+) 1,200.00 = 101,200.00
Cargo, Liquid (12 ton) 24 x 50 (+) 1,200.00 = 102,400.00
CASE 50,000 (+) 50,000.00 = 152,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 177,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 202,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 227,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 252,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 277,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 302,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 327,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 352,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 377,400.00
Fluid Suction System 25,000 (+) 25,000.00 = 402,400.00
Sprayer 1,000 (+) 1,000.00 = 403,400.00
Sprayer 1,000 (+) 1,000.00 = 404,400.00
Sprayer 1,000 (+) 1,000.00 = 405,400.00
Sprayer 1,000 (+) 1,000.00 = 406,400.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 406,400.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,089,166.67
Weapons and Equipment Cost (+) 406,400.00 = 1,495,566.67
Combat Vehicle Cost Multiplier 1 + (70 / 200) (*) 1.35 = 2,019,015.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,019,015.00
|