Cost Breakdown
Name/Model: Lightning Attack Hovercraft SLDFrB
Technology: Inner Sphere
Tonnage: 35
Configuration: Hover Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (71 pts) 4.0 x 20,000 80,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 115,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 135,000.00
Lift/Dive Equipment 3.5 x 20,000 (+) 70,000.00 = 205,000.00
Engine (Fusion) (5,000 x 175 x 35) / 75 (+) 408,333.33 = 613,333.33
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 613,333.33
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Guardian ECM Suite 200,000 200,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 260,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 360,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 460,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 460,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 460,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 460,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 613,333.33
Weapons and Equipment Cost (+) 460,000.00 = 1,073,333.33
Combat Vehicle Cost Multiplier 1 + (35 / 50) (*) 1.7 = 1,824,666.67
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,824,667.00
|