Cost Breakdown
Name/Model: J. Edgar Light Hover Tank SLDFrSC
Technology: Inner Sphere
Tonnage: 25
Configuration: Hover Combat Vehicle
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (71 pts) 4.0 x 20,000 80,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 105,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 120,000.00
Lift/Dive Equipment 2.5 x 20,000 (+) 50,000.00 = 170,000.00
Engine (XL) (20,000 x 170 x 25) / 75 (+) 1,133,333.33 = 1,303,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 1,305,833.33
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,305,833.33
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Beagle Active Probe 200,000 200,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 400,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 500,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 500,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 516,000.00
TAG 50,000 (+) 50,000.00 = 566,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 566,000.00
========================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost 1,305,833.33
Weapons and Equipment Cost (+) 566,000.00 = 1,871,833.33
Combat Vehicle Cost Multiplier 1 + (25 / 50) (*) 1.5 = 2,807,750.00
------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,807,750.00
|