Cost Breakdown
Name/Model: ER Large Laser Carrier (Royal)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (224 pts) 12.5 x 20,000 250,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 330,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 370,000.00
Engine (XL) (20,000 x 240 x 80) / 75 (+) 5,120,000.00 = 5,490,000.00
Heat Sinks (Single) 26 x 2,000 (+) 52,000.00 = 5,542,000.00
Turret 2 x 5,000 (+) 10,000.00 = 5,552,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,552,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
ER Large Laser 200,000 (+) 200,000.00 = 350,000.00
ER Large Laser 200,000 (+) 200,000.00 = 550,000.00
ER Large Laser 200,000 (+) 200,000.00 = 750,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 950,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 950,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 5,552,000.00
Weapons and Equipment Cost (+) 950,000.00 = 6,502,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 11,703,600.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 11,703,600.00
|