Cost Breakdown
Name/Model: ACM Manticore MNT-H3 (Jalapeno)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (241 pts) 13.5 x 20,000 270,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 330,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 360,000.00
Engine (Fusion) (5,000 x 180 x 60) / 75 (+) 720,000.00 = 1,080,000.00
Heat Sinks (Single) 8 x 2,000 (+) 16,000.00 = 1,096,000.00
Turret 1 x 5,000 (+) 5,000.00 = 1,101,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,101,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Slave 250,000 (+) 250,000.00 = 350,000.00
CASE 50,000 (+) 50,000.00 = 400,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 407,500.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 415,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 615,000.00
Medium Laser 40,000 (+) 40,000.00 = 655,000.00
Medium Laser 40,000 (+) 40,000.00 = 695,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 955,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 955,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 955,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 971,000.00
Sponson Turrets 0.5 x 4,000 (+) 2,500.00 = 973,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 973,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,101,000.00
Weapons and Equipment Cost (+) 973,500.00 = 2,074,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 3,319,200.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,319,200.00
|