Cost Breakdown
Name/Model: ACM Manticore MNT-P3
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (241 pts) 13.5 x 20,000 270,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 330,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 360,000.00
Engine (Fusion) (5,000 x 180 x 60) / 75 (+) 720,000.00 = 1,080,000.00
Heat Sinks (Single) 11 x 2,000 (+) 22,000.00 = 1,102,000.00
Turret 1 x 5,000 (+) 5,000.00 = 1,107,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,107,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Slave 250,000 (+) 250,000.00 = 350,000.00
CASE 50,000 (+) 50,000.00 = 400,000.00
Light PPC 150,000 (+) 150,000.00 = 550,000.00
Light PPC 150,000 (+) 150,000.00 = 700,000.00
Light PPC 150,000 (+) 150,000.00 = 850,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 910,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 926,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 926,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,107,000.00
Weapons and Equipment Cost (+) 926,000.00 = 2,033,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 3,252,800.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,252,800.00
|