Cost Breakdown
Name/Model: ACM Manticore MNT-X1
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 290,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 320,000.00
Engine (Fusion) (5,000 x 240 x 60) / 75 (+) 960,000.00 = 1,280,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,287,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,287,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Slave 250,000 (+) 250,000.00 = 350,000.00
CASE 50,000 (+) 50,000.00 = 400,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 600,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 850,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
Medium Laser 40,000 (+) 40,000.00 = 890,000.00
MRM 10 50,000 (+) 50,000.00 = 940,000.00
MRM 10 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 940,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 956,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 972,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 972,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,287,500.00
Weapons and Equipment Cost (+) 972,000.00 = 2,259,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 3,615,200.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,615,200.00
|