Cost Breakdown
Name/Model: Fortune Urban Command Tank
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 367,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 407,500.00
Engine (Fuel Cell) (3,500 x 220 x 80) / 75 (+) 821,333.33 = 1,228,833.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,230,833.33
Turret 3 x 5,000 (+) 15,000.00 = 1,245,833.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,245,833.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
C3 Computer (Master) 1,500,000 1,500,000.00
CASE 50,000 (+) 50,000.00 = 1,550,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 2,150,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,750,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 2,750,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,750,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,245,833.33
Weapons and Equipment Cost (+) 2,750,000.00 = 3,995,833.33
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 5,594,166.67
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,594,167.00
|