Cost Breakdown
Name/Model: Raven RV-2
Technology: Inner Sphere
Tonnage: 30
Configuration: VTOL Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (89 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 130,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 145,000.00
Rotors 3 x 40,000 (+) 120,000.00 = 265,000.00
Engine (XL) (20,000 x 70 x 30) / 75 (+) 560,000.00 = 825,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 825,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
LB 20-X AC 600,000 600,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 600,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 600,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 600,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 825,000.00
Weapons and Equipment Cost (+) 600,000.00 = 1,425,000.00
Combat Vehicle Cost Multiplier 1 + (30 / 30) (*) 2 = 2,850,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,850,000.00
|