Cost Breakdown
Name/Model: Padilla Heavy Artillery Tank (LRM)
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (88 pts) 5.5 x 10,000 55,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 130,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 170,000.00
Engine (XL) (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 7,670,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,670,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
LRM 20 250,000 (+) 250,000.00 = 350,000.00
LRM 20 250,000 (+) 250,000.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 600,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 600,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 7,670,000.00
Weapons and Equipment Cost (+) 600,000.00 = 8,270,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 14,472,500.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,472,500.00
|