Cost Breakdown
Name/Model: Barton MASH BM-4077
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (128 pts) 7.5 x 20,000 150,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 230,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 270,000.00
Engine (Fusion) (5,000 x 300 x 80) / 75 (+) 1,600,000.00 = 1,870,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,870,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Cargo, Insulated (3.5 ton) 7 x 125 (+) 875.00 = 100,875.00
Cargo, Liquid (3.5 ton) 7 x 50 (+) 350.00 = 101,225.00
Cargo, Refrigerated (3.5 ton) 7 x 100 (+) 700.00 = 101,925.00
Cargo, Standard (3.5 ton) 7 x 0 (+) 0.00 = 101,925.00
CASE 50,000 (+) 50,000.00 = 151,925.00
Field Kitchen 25,000 (+) 25,000.00 = 176,925.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 376,925.00
MASH Equipment (Core) 35,000 (+) 35,000.00 = 411,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 421,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 431,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 441,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 451,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 461,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 471,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 481,925.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 491,925.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 491,925.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,870,000.00
Weapons and Equipment Cost (+) 491,925.00 = 2,361,925.00
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 3,306,695.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,306,695.00
|