Cost Breakdown
Name/Model: SPG TOM C
Technology: Clan
Tonnage: 60
Configuration: Tracked Combat Vehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard) (40 pts) 2.5 x 10,000 25,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 85,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 115,000.00
Engine (XL) (20,000 x 180 x 60) / 75 (+) 2,880,000.00 = 2,995,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,995,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 850,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 850,000.00
CASE 1 x 50,000 (+) 50,000.00 = 900,000.00
Flamer 7,500 (+) 7,500.00 = 907,500.00
Long Tom 450,000 (+) 450,000.00 = 1,357,500.00
Long Tom (Ammo 5) [Copperhead] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Copperhead] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Copperhead] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [FASCAM] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [FASCAM] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Illumination] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
Long Tom (Ammo 5) [Smoke] [Empty Bin] 0 (+) 0.00 = 1,357,500.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,357,500.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 2,995,000.00
Weapons and Equipment Cost (+) 1,357,500.00 = 4,352,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 6,964,000.00
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,964,000.00
|