Cost Breakdown
Name/Model: TOM SPG III
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (40 pts) 2.5 x 10,000 25,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 90,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 125,000.00
Engine (Fusion) (5,000 x 195 x 65) / 75 (+) 845,000.00 = 970,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 970,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Bulldozer 50,000 50,000.00
C3 Slave 250,000 (+) 250,000.00 = 300,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 500,000.00
Long Tom 450,000 (+) 450,000.00 = 950,000.00
Long Tom (Ammo 5) [Copperhead] [Empty Bin] 0 (+) 0.00 = 950,000.00
Long Tom (Ammo 5) [Copperhead] [Empty Bin] 0 (+) 0.00 = 950,000.00
Long Tom (Ammo 5) [Empty Bin] 0 (+) 0.00 = 950,000.00
Long Tom (Ammo 5) [Empty Bin] 0 (+) 0.00 = 950,000.00
Long Tom (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 950,000.00
Machine Gun 5,000 (+) 5,000.00 = 955,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 955,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 955,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 970,000.00
Weapons and Equipment Cost (+) 955,000.00 = 1,925,000.00
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 3,176,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,176,250.00
|