Cost Breakdown
Name/Model: TOM SPG
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard) (85 pts) 5.5 x 10,000 55,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 105,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 130,000.00
Engine (Internal Combustion) (1,250 x 100 x 50) / 75 (+) 83,333.33 = 213,333.33
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 213,333.33
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Bulldozer 50,000 (+) 50,000.00 = 150,000.00
C3 Slave 250,000 (+) 250,000.00 = 400,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 600,000.00
Long Tom Artillery Cannon 650,000 (+) 650,000.00 = 1,250,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Long Tom Artillery Cannon (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Long Tom Artillery Cannon (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,255,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,255,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,255,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 213,333.33
Weapons and Equipment Cost (+) 1,255,000.00 = 1,468,333.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,202,500.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,202,500.00
|