Cost Breakdown
Name/Model: Dart Command Support Tank
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (268 pts) 15.0 x 20,000 300,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 380,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 420,000.00
Engine (XL) (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 7,246,666.67
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,246,666.67
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Cargo, Standard (1 ton) 2 x 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Drone Carrier Control System (2 drones) 3 x 10,000 (+) 30,000.00 = 180,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 380,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 780,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,180,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,180,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,220,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,260,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,260,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 7,246,666.67
Weapons and Equipment Cost (+) 1,260,000.00 = 8,506,666.67
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 15,312,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 15,312,000.00
|