Cost Breakdown
Name/Model: Onuris Attack VTOL C
Technology: Clan
Tonnage: 30
Configuration: VTOL OmniVehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective) (88 pts) 5.5 x 30,000 165,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 195,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 210,000.00
Rotors 3 x 40,000 (+) 120,000.00 = 330,000.00
Engine (XL) (20,000 x 100 x 30) / 75 (+) 800,000.00 = 1,130,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,130,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 650,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 650,000.00
VTOL Jet Booster 100 x 10,000 (+) 1,000,000.00 = 1,650,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,650,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,130,000.00
Weapons and Equipment Cost (+) 1,650,000.00 = 2,780,000.00
Omni Conversion Cost 2,780,000.00 x 0.25 (+) 695,000.00 = 3,475,000.00
Combat Vehicle Cost Multiplier 1 + (30 / 30) (*) 2 = 6,950,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,950,000.00
|