Cost Breakdown
Name/Model: Rifleman (Arcadian Variant) RFL-ARC1
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (184 pts) 11.5 x 10,000 115,000.00
Internal Structure (Endo Steel): 60 x 1,600 x 1 (+) 96,000.00 = 211,000.00
Myomer (Standard): 60 x 2,000 (+) 120,000.00 = 331,000.00
Engine (XL): (20,000 x 300 x 60) / 75 (+) 4,800,000.00 = 5,131,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,031,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,231,000.00
Life Support: 50,000 (+) 50,000.00 = 6,281,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 6,401,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 6,461,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 12,000.00 = 6,473,000.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 6,515,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,515,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 160,000.00
ER Small Laser 11,250 (+) 11,250.00 = 171,250.00
ER Small Laser 11,250 (+) 11,250.00 = 182,500.00
ER Small Laser 11,250 (+) 11,250.00 = 193,750.00
ER Small Laser 11,250 (+) 11,250.00 = 205,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 355,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 505,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 655,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 805,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 805,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 805,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 805,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,515,000.00
Weapons and Equipment Cost: (+) 805,000.00 = 7,320,000.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 11,712,000.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,712,000.00
|