Cost Breakdown
Name/Model: Stinger STG-5G
Technology: Inner Sphere
Tonnage: 20
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (69 pts) 4.5 x 10,000 45,000.00
Internal Structure (Endo Steel): 20 x 1,600 x 1 (+) 32,000.00 = 77,000.00
Myomer (Standard): 20 x 2,000 (+) 40,000.00 = 117,000.00
Engine (XL): (20,000 x 140 x 20) / 75 (+) 746,666.67 = 863,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,463,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 1,663,666.67
Life Support: 50,000 (+) 50,000.00 = 1,713,666.67
Sensors: 20 x 2,000 (+) 40,000.00 = 1,753,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 1,813,666.67
Arm Actuators: 20 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 9,200.00 = 1,822,866.67
Leg Actuators: 20 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 14,000.00 = 1,836,866.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,836,866.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Full-Head Ejection System 1,725,000 1,725,000.00
Jump Jets 20 x (6 x 6) x 200 (+) 144,000.00 = 1,869,000.00
Light PPC 150,000 (+) 150,000.00 = 2,019,000.00
PPC Capacitor 150,000 (+) 150,000.00 = 2,169,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,169,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,836,866.67
Weapons and Equipment Cost: (+) 2,169,000.00 = 4,005,866.67
BattleMech Cost Multiplier: 1 + (20 / 100) (*) 1.20 = 4,807,040.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,807,040.00
|