Cost Breakdown
Name/Model: Rifleman II (Legend Killer) RFL-3N-2L
Technology: Inner Sphere
Tonnage: 85
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (208 pts) 13.0 x 10,000 130,000.00
Internal Structure (Endo Steel): 85 x 1,600 x 1 (+) 136,000.00 = 266,000.00
Myomer (Standard): 85 x 2,000 (+) 170,000.00 = 436,000.00
Engine (XL): (20,000 x 340 x 85) / 75 (+) 7,706,666.67 = 8,142,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,342,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,542,666.67
Life Support: 50,000 (+) 50,000.00 = 9,592,666.67
Sensors: 85 x 2,000 (+) 170,000.00 = 9,762,666.67
Heat Sinks (Double): 14 x 6,000 (+) 84,000.00 = 9,846,666.67
Arm Actuators: 85 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 17,000.00 = 9,863,666.67
Leg Actuators: 85 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 59,500.00 = 9,923,166.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,923,166.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Jump Jets 85 x (4 x 4) x 200 272,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 447,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 622,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,022,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,422,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,422,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,422,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,422,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,422,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,923,166.67
Weapons and Equipment Cost: (+) 1,422,000.00 = 11,345,166.67
BattleMech Cost Multiplier: 1 + (85 / 100) (*) 1.85 = 20,988,558.33
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,988,558.00
|