Cost Breakdown
Name/Model: Hybrid Rifleman (Growler) Rifleman RFL-4DG2
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped FrankenMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (231 pts) 14.5 x 10,000 145,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 175,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 325,000.00
Engine (Fusion): (5,000 x 300 x 75) / 75 (+) 1,500,000.00 = 1,825,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,725,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,925,000.00
Life Support: 50,000 (+) 50,000.00 = 2,975,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 3,125,000.00
Heat Sinks (Single): 2 x 2,000 (+) 4,000.00 = 3,129,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 24,750.00 = 3,153,750.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 3,206,250.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,206,250.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Command Console 500,000 500,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 700,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 900,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,100,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,300,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,700,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,700,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,700,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,700,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,700,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,700,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,740,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,740,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,206,250.00
Weapons and Equipment Cost: (+) 1,740,000.00 = 4,946,250.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 8,655,937.50
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 8,655,938.00
|