Cost Breakdown
Name/Model: Quad X-1 Aimee 210
Technology: Inner Sphere
Tonnage: 90
Configuration: Quad BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (295 pts) 18.5 x 10,000 185,000.00
Internal Structure (Standard): 90 x 400 x 1 (+) 36,000.00 = 221,000.00
Myomer (Standard): 90 x 2,000 (+) 180,000.00 = 401,000.00
Engine (XL): (20,000 x 360 x 90) / 75 (+) 8,640,000.00 = 9,041,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 10,241,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 10,441,000.00
Life Support: 50,000 (+) 50,000.00 = 10,491,000.00
Sensors: 90 x 2,000 (+) 180,000.00 = 10,671,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 10,731,000.00
Leg Actuators: 90 x ((150 x 4) + (80 x 4) + (120 x 4)) (+) 126,000.00 = 10,857,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,857,000.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Jump Jets 90 x (4 x 4) x 200 (+) 288,000.00 = 338,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 738,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,138,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,138,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,138,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,138,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,138,000.00
Quad Turret 0.5 x 10,000 (+) 5,000.00 = 1,143,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,158,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,173,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,173,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,173,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,857,000.00
Weapons and Equipment Cost: (+) 1,173,000.00 = 12,030,000.00
BattleMech Cost Multiplier: 1 + (90 / 100) (*) 1.90 = 22,857,000.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 22,857,000.00
|