Cost Breakdown
Name/Model: Sha Yu (Spotter) SYU-6B
Technology: Inner Sphere (Mixed)
Tonnage: 40
Configuration: Biped BattleMech
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Stealth): (120 pts) 7.5 x 50,000 375,000.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 439,000.00
Myomer (MASC): (320 x 2 x 1,000) + (40 x 2,000) (+) 720,000.00 = 1,159,000.00
Engine (XL): (20,000 x 320 x 40) / 75 (+) 3,413,333.33 = 4,572,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 5,772,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,972,333.33
Life Support: 50,000 (+) 50,000.00 = 6,022,333.33
Sensors: 40 x 2,000 (+) 80,000.00 = 6,102,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 6,162,333.33
Arm Actuators: 40 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 8,000.00 = 6,170,333.33
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 6,198,333.33
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,198,333.33
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 30,000.00
C3 Slave 250,000 (+) 250,000.00 = 280,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 480,000.00
Jump Jets 40 x (8 x 8) x 200 (+) 512,000.00 = 992,000.00
TAG 50,000 (+) 50,000.00 = 1,042,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,042,000.00
==============================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,198,333.33
Weapons and Equipment Cost: (+) 1,042,000.00 = 7,240,333.33
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 10,136,466.67
------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,136,467.00
|