Cost Breakdown
Name/Model: Zipper-2 (Roadrunner)
Technology: Clan (Mixed)
Tonnage: 35
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (115 pts) 6.0 x 20,000 120,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 176,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 246,000.00
Engine (XXL): (100,000 x 245 x 35) / 75 (+) 11,433,333.33 = 11,679,333.33
Gyro (XL): 1.5 x 750,000 (+) 1,125,000.00 = 12,804,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 12,979,333.33
Life Support: 50,000 (+) 50,000.00 = 13,029,333.33
Sensors: 35 x 2,000 (+) 70,000.00 = 13,099,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 13,159,333.33
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 16,100.00 = 13,175,433.33
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 13,199,933.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,199,933.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER PPC 300,000 (+) 300,000.00 = 350,000.00
ER Small Laser 11,250 (+) 11,250.00 = 361,250.00
Gauss Rifle 300,000 (+) 300,000.00 = 661,250.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 661,250.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 661,250.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,199,933.33
Weapons and Equipment Cost: (+) 661,250.00 = 13,861,183.33
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 18,712,597.50
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,712,597.00
|