Cost Breakdown
Name/Model: Watchman WTC-4DM2
Technology: Inner Sphere
Tonnage: 40
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (137 pts) 8.0 x 20,000 160,000.00
Internal Structure (Standard): 40 x 400 x 1 (+) 16,000.00 = 176,000.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 256,000.00
Engine (Light Fusion): (15,000 x 200 x 40) / 75 (+) 1,600,000.00 = 1,856,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,456,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,656,000.00
Life Support: 50,000 (+) 50,000.00 = 2,706,000.00
Sensors: 40 x 2,000 (+) 80,000.00 = 2,786,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 2,858,000.00
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 18,400.00 = 2,876,400.00
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 2,904,400.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,904,400.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
ER Flamer 15,000 15,000.00
ER Flamer 15,000 (+) 15,000.00 = 30,000.00
Jump Jets 40 x (5 x 5) x 200 (+) 200,000.00 = 230,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 480,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 488,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 497,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 497,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 497,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,904,400.00
Weapons and Equipment Cost: (+) 497,000.00 = 3,401,400.00
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 4,761,960.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,761,960.00
|