Cost Breakdown
Name/Model:         JI2A1 Downgrade
Technology:         Inner Sphere
Tonnage:            25
Configuration:      Hover Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Standard)                   (64 pts) 4.0 x 10,000                40,000.00                    
  Internal Structure (Standard)      2.5 x 10,000             (+)         25,000.00  =        65,000.00
  Control Components                 1.5 x 10,000             (+)         15,000.00  =        80,000.00
  Lift/Dive Equipment                2.5 x 20,000             (+)         50,000.00  =       130,000.00
  Engine (Fuel Cell)                 (3,500 x 120 x 25) / 75  (+)        140,000.00  =       270,000.00
  Heat Sinks (Single)                1 x 2,000                (+)          2,000.00  =       272,000.00
  Turret                             0.5 x 5,000              (+)          2,500.00  =       274,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                        274,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  Compartment, Infantry (4 ton)      8 x 0                                     0.00                    
  SRM 4                              60,000                   (+)         60,000.00  =        60,000.00
  SRM 4                              60,000                   (+)         60,000.00  =       120,000.00
  SRM 4 (Ammo 25) [Empty Bin]        0                        (+)              0.00  =       120,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             120,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                        274,500.00                    
  Weapons and Equipment Cost                                  (+)        120,000.00  =       394,500.00
  Combat Vehicle Cost Multiplier     1 + (25 / 50)            (*)               1.5  =       591,750.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                    591,750.00
 
		 |