Cost Breakdown
Name/Model: AC 10 harasser
Technology: Inner Sphere
Tonnage: 40
Configuration: Hover Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 115,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 135,000.00
Lift/Dive Equipment 4 x 20,000 (+) 80,000.00 = 215,000.00
Engine (Internal Combustion) (1,250 x 105 x 40) / 75 (+) 70,000.00 = 285,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 292,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 292,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 292,500.00
Weapons and Equipment Cost (+) 400,000.00 = 692,500.00
Combat Vehicle Cost Multiplier 1 + (40 / 50) (*) 1.8 = 1,246,500.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,246,500.00
|