|                  Cost Breakdown
Name/Model:         Heavy BattleMech Recovery Vehicle Technical
Technology:         Inner Sphere
Tonnage:            70
Configuration:      Wheeled Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
  Armor (Standard)                    (40 pts) 2.5 x 10,000                25,000.00                    
  Internal Structure (Standard)       7.0 x 10,000             (+)         70,000.00  =        95,000.00
  Control Components                  3.5 x 10,000             (+)         35,000.00  =       130,000.00
  Engine (Internal Combustion)        (1,250 x 260 x 70) / 75  (+)        303,333.33  =       433,333.33
--------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         433,333.33
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
  LB 10-X AC                          400,000                             400,000.00                    
  LB 10-X AC                          400,000                  (+)        400,000.00  =       800,000.00
  LB 10-X AC (Ammo 10) [Empty Bin]    0                        (+)              0.00  =       800,000.00
  LB 10-X AC (Ammo 10) [Empty Bin]    0                        (+)              0.00  =       800,000.00
  Machine Gun                         5,000                    (+)          5,000.00  =       805,000.00
  Machine Gun (Ammo 100) [Empty Bin]  0                        (+)              0.00  =       805,000.00
  SRM 6                               80,000                   (+)         80,000.00  =       885,000.00
  SRM 6 (Ammo 15) [Empty Bin]         0                        (+)              0.00  =       885,000.00
  SRM 6 (Ammo 15) [Empty Bin]         0                        (+)              0.00  =       885,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                              885,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
  Structural Cost                                                         433,333.33                    
  Weapons and Equipment Cost                                   (+)        885,000.00  =     1,318,333.33
  Combat Vehicle Cost Multiplier      1 + (70 / 200)           (*)              1.35  =     1,779,750.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                   1,779,750.00
 |