Cost Breakdown
Name/Model:         Chevalier Light Tank
Technology:         Inner Sphere
Tonnage:            35
Configuration:      Wheeled Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
  Armor (Standard)                    (104 pts) 6.5 x 10,000               65,000.00                    
  Internal Structure (Standard)       3.5 x 10,000             (+)         35,000.00  =       100,000.00
  Control Components                  2 x 10,000               (+)         20,000.00  =       120,000.00
  Engine (Fusion)                     (5,000 x 190 x 35) / 75  (+)        443,333.33  =       563,333.33
  Heat Sinks (Single)                 2 x 2,000                (+)          4,000.00  =       567,333.33
  Turret                              0.5 x 5,000              (+)          2,500.00  =       569,833.33
--------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         569,833.33
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
  ER Large Laser                      200,000                             200,000.00                    
  Streak SRM 2                        15,000                   (+)         15,000.00  =       215,000.00
  Streak SRM 2                        15,000                   (+)         15,000.00  =       230,000.00
  Streak SRM 2 (Ammo 50) [Empty Bin]  0                        (+)              0.00  =       230,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                              230,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
  Structural Cost                                                         569,833.33                    
  Weapons and Equipment Cost                                   (+)        230,000.00  =       799,833.33
  Combat Vehicle Cost Multiplier      1 + (35 / 200)           (*)             1.175  =       939,804.17
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                     939,804.00
 
		 |