Cost Breakdown
Name/Model: Partisan AA
Technology: Inner Sphere
Tonnage: 50
Configuration: Wheeled Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (104 pts) 5.5 x 25,000 137,500.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 187,500.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 212,500.00
Engine (Fusion) (5,000 x 230 x 50) / 75 (+) 766,666.67 = 979,166.67
Turret 2 x 5,000 (+) 10,000.00 = 989,166.67
-------------------------------------------------------------------------------------------------------
Total Structural Cost 989,166.67
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
LB 5-X AC 250,000 250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 989,166.67
Weapons and Equipment Cost (+) 500,000.00 = 1,489,166.67
Combat Vehicle Cost Multiplier 1 + (50 / 200) (*) 1.25 = 1,861,458.33
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,861,458.00
|