Cost Breakdown
Name/Model: Gladius Medium Hovertank Mk. III
Technology: Inner Sphere
Tonnage: 40
Configuration: Hover Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (107 pts) 6.0 x 20,000 120,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 160,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 180,000.00
Lift/Dive Equipment 4 x 20,000 (+) 80,000.00 = 260,000.00
Engine (Fuel Cell) (3,500 x 145 x 40) / 75 (+) 270,666.67 = 530,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 532,666.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 532,666.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 465,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 480,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 495,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 495,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 532,666.67
Weapons and Equipment Cost (+) 495,000.00 = 1,027,666.67
Combat Vehicle Cost Multiplier 1 + (40 / 50) (*) 1.8 = 1,849,800.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,849,800.00
|