Cost Breakdown
Name/Model: Po Heavy Tank (Fuel Cell)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (198 pts) 10.0 x 25,000 250,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 310,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 340,000.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 1,012,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,014,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,024,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,024,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
Machine Gun 5,000 (+) 5,000.00 = 455,000.00
Machine Gun 5,000 (+) 5,000.00 = 460,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 460,000.00
MML 5 75,000 (+) 75,000.00 = 535,000.00
MML 5 75,000 (+) 75,000.00 = 610,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 610,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 610,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 610,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 610,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,024,000.00
Weapons and Equipment Cost (+) 610,000.00 = 1,634,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,614,400.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,614,400.00
|