Cost Breakdown
Name/Model: Jenner 2
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective): (112 pts) 7.0 x 30,000 210,000.00
Internal Structure (Standard): 35 x 400 x 1 (+) 14,000.00 = 224,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 294,000.00
Engine (XL): (20,000 x 245 x 35) / 75 (+) 2,286,666.67 = 2,580,666.67
Gyro (XL): 1.5 x 750,000 (+) 1,125,000.00 = 3,705,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,905,666.67
Life Support: 50,000 (+) 50,000.00 = 3,955,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 4,025,666.67
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 4,103,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 7,000.00 = 4,110,666.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 4,135,166.67
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,135,166.67
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 350,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 450,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 550,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 650,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 650,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,135,166.67
Weapons and Equipment Cost: (+) 650,000.00 = 4,785,166.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 6,459,975.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,459,975.00
|