Cost Breakdown
Name/Model: Kite (Combat Vehicle)
Technology: Clan
Tonnage: 30
Configuration: Hover Combat Vehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 7.5 x 20,000 150,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 180,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 195,000.00
Lift/Dive Equipment 3 x 20,000 (+) 60,000.00 = 255,000.00
Engine (Fuel Cell) (3,500 x 140 x 30) / 75 (+) 196,000.00 = 451,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 453,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 455,500.00
----------------------------------------------------------------------------------------------------------
Total Structural Cost 455,500.00
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
Active Probe 200,000 200,000.00
Angel ECM Suite 750,000 (+) 750,000.00 = 950,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 960,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 970,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 970,000.00
CASE 2 x 50,000 (+) 100,000.00 = 1,070,000.00
Light TAG 40,000 (+) 40,000.00 = 1,110,000.00
SRM 2 10,000 (+) 10,000.00 = 1,120,000.00
SRM 2 10,000 (+) 10,000.00 = 1,130,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,130,000.00
Targeting Computer 1 x 10,000 (+) 10,000.00 = 1,140,000.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,140,000.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
Structural Cost 455,500.00
Weapons and Equipment Cost (+) 1,140,000.00 = 1,595,500.00
Combat Vehicle Cost Multiplier 1 + (30 / 50) (*) 1.6 = 2,552,800.00
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,552,800.00
|