Cost Breakdown
Name/Model: Demolisher (Fission)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (218 pts) 11.0 x 25,000 275,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 355,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 395,000.00
Engine (Fission) (7,500 x 160 x 80) / 75 (+) 1,280,000.00 = 1,675,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 1,685,000.00
Turret 3 x 5,000 (+) 15,000.00 = 1,700,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,700,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
LB 20-X AC 600,000 600,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Supercharger 160 x 10,000 (+) 1,600,000.00 = 2,800,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,800,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,700,000.00
Weapons and Equipment Cost (+) 2,800,000.00 = 4,500,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 8,100,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,100,000.00
|