Cost Breakdown
Name/Model: Franken Mech (C.Ackerman TM) Vdos
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (115 pts) 6.0 x 20,000 120,000.00
Internal Structure (Composite): 55 x 1,600 x 1 (+) 88,000.00 = 208,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 318,000.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,351,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,251,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 5,426,333.33
Life Support: 50,000 (+) 50,000.00 = 5,476,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 5,586,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 5,646,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 18,150.00 = 5,664,483.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 5,702,983.33
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,702,983.33
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
CASE (C) 1 x 50,000 50,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 325,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 575,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 825,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 925,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,025,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,125,000.00
Partial Wing (C) 3 x 50,000 (+) 150,000.00 = 1,275,000.00
SRM 6 80,000 (+) 80,000.00 = 1,355,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,355,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,355,000.00
====================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,702,983.33
Weapons and Equipment Cost: (+) 1,355,000.00 = 7,057,983.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,939,874.17
--------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,939,874.00
|