Cost Breakdown
Name/Model: Alacorn Heavy Tank (SD) "Safety Dance" v2
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (215 pts) 12.0 x 20,000 240,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 335,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 385,000.00
Engine (Fusion) (5,000 x 285 x 95) / 75 (+) 1,805,000.00 = 2,190,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 2,194,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,209,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,209,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Slave 250,000 (+) 250,000.00 = 350,000.00
CASE 50,000 (+) 50,000.00 = 400,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 410,000.00
ER Large Laser 200,000 (+) 200,000.00 = 610,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 885,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 1,160,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,160,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,160,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 1,170,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,170,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 2,209,000.00
Weapons and Equipment Cost (+) 1,170,000.00 = 3,379,000.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 6,589,050.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,589,050.00
|